St. Johns Shipyards

St. Johns Shipyards
Insustrial
The design for the replacement of a deteriorated launch-rail system for new barges and ships constructed at the facility included structural analysis and design parameters for new steel sheet pile perimeter bulkheads throughout facility. The bulkhead exposures ranged from 15 feet to 25 feet.