St. Augustine Marina

St. Augustine Marina
Municipal
Baker Klein performed the design for a new 300-ton marine travel lift that extends approximately 150 feet into the San Sebastian River. Baker Klein also provided structural design for new steel and pre-cast concrete bulkheads and structural design of 70-foot by 140-foot concrete slab for maintenance and repairs to sea craft.