St. Augustine High School

St. Augustine High School
Education
Structural design of the existing weight room roof to be lifted (raised) approximately 16 inches. The original height of the roof was approximately 8 feet and was raised to allow better access for weight lifting activities. The walls were shored during the roof raising activities and all MEP equipment (roof-top units) remained in place.